Leagold Reports High-Grade Infill Drilling Results from Bermejal Drilling Program

Leagold Reports High-Grade Infill Drilling Results from Bermejal Drilling Program

Canada NewsWire

VANCOUVER, Aug. 31, 2017 /CNW/ - Leagold Mining Corporation (TSX: LMC) ("Leagold" or the "Company") is pleased to report several high-grade drilling results from Bermejal including 15.5 grams per tonne ("gpt") over 27.0 metres, 17.4 gpt over 13.3 metres, 8.0 gpt over 20.3 metres and 16.8 gpt over 8.6 metres (all capped grades and true widths; see Table 1).  These results are part of 20 holes being reported from the infill and step-out exploration program at the Bermejal Underground deposit at the Los Filos Mine, following the initial 20 holes reported on July 13, 2017.  

Neil Woodyer, CEO stated "This second set of holes continue to delineate the broad widths and high grades of the mineralization below the junction of the sill and the Bermejal intrusive.  Overall the program has an impressive 90% success rate with 36 of the 40 holes drilled intercepting the key targets."

Over 25,000 metres (45%) of the 56,000 metre Bermejal Underground program have been completed.  A total of 62 of the planned 113 holes have been drilled and, to date 40 holes have been reported, 12 are in progress and the remaining 10 are in the process of sampling or assaying.  The entire drilling program is expected to be completed within 2017 and these drill hole results will be incorporated in an updated resource estimate.

Bermejal Underground mineralization extends approximately 1,600 metres along the strike of the intrusive contact and has a vertical depth extent of over 600 metres (Figure 1). The drilling shows consistent oxide mineralization at carbonate/intrusive contacts either along the intrusive contact or below the intersection between the sill and the Bermejal intrusive contact (a "sub-sill" deposit; Figure 2).  The mineralization in the Bermejal Underground deposit remains open in several directions.

All holes intersected iron-oxide skarn mineralization as targeted and only two holes (BU-36-17, BU-40-17) were below a 3 gpt over 3 m diluted minimum width threshold.

Bermejal Underground Expansion Project Update

An environmental permit for the mine portal and exploration ramp was completed in July 2017 (see news release dated July 31, 2017).  Surface preparation for the portal is currently underway.  The ramp will provide access to the eastern and central portions of the deposit and will enable additional exploration, allow collection of material for confirmatory metallurgical testwork for heap leaching, demonstrate the minability of Bermejal Underground, and advance the project towards declaration of reserves.

Table 1: Drilling Program Highlights for Bermejal Underground Deposit

Sector

Hole ID

Zone

Skarn
Type

From
(m)

To

(m)

Length
(m)

True
Width (m)

Grade
(g/t Au)

Capped
(g/t Au)

Central

BU-14-17

UI

Exo

301.25

304.35

3.10

2.68

9.9



and

LC

Endo

470.10

473.35

3.25

3.05

9.0



and

LC

Endo

478.95

487.70

8.75

8.22

8.1



and

LI

Endo

575.50

583.70

8.20

2.12

9.2



including

LI

Endo

579.00

582.20

3.20

0.83

19.7


Central

BU-14A-17

LI

Exo

603.00

608.35

5.35

4.22

14.2



and

LI

Exo

614.75

617.20

2.45

1.93

5.7



and

LI

Exo

704.05

713.20

9.15

7.76

5.3



including

LI

Exo

704.05

707.75

3.70

3.14

7.8


East

BU-21-17

UI

Exo

270.35

273.95

3.60

3.38

4.4



and

UI

Endo

277.45

283.95

6.50

6.11

3.2



and

UI

Endo

307.45

321.30

13.85

13.01

4.4


East

BU-22-17

LC

Exo

546.35

552.60

6.25

6.16

3.4



including

LC

Exo

546.35

547.65

1.30

1.28

11.6


Central

BU-23-17

UC

Exo

373.55

380.85

7.30

7.19

4.5



and

Sill

Endo

405.20

411.65

6.45

6.23

6.2



and

Sill/LC

Endo/Exo

454.55

476.15

21.60

20.30

8.0



including

LC

Exo

457.30

470.60

13.30

12.50

10.9



and

LI

Exo

566.10

571.85

5.75

2.43

3.8


Central

BU-24-17

UC

Exo

300.90

303.80

2.90

2.89

4.7



and

LI

Endo

455.55

460.40

4.85

3.97

3.4



and

LI

Endo

478.05

481.55

3.50

2.87

3.3



and

LI

Endo

526.10

528.30

2.20

1.80

9.3



and

LI

Endo

577.80

579.15

1.35

1.11

9.9


Central

BU-25-17

UI

Endo

242.80

247.15

4.35

3.33

3.4


Central

BU-25A-17

Sill

Endo

396.20

400.20

4.00

3.06

4.44



and

LI

Endo

531.90

536.80

4.90

0.85

24.23

21.9

Central

BU-26-17

UC

Endo

247.05

250.55

3.50

2.87

4.0


Central

BU-27-17

UC

Exo

220.15

221.65

1.50

1.45

10.5



and

UI

Endo

255.90

268.10

12.20

11.78

5.2



and

UI

Endo

279.00

281.70

2.70

2.61

5.0



and

UI

Endo

309.95

314.90

4.95

4.78

7.0


Central

BU-28-17

UI

Exo

237.20

240.45

3.25

2.49

4.9



and

UI

Endo

268.00

273.10

5.10

3.91

6.9



and

UI

Endo

279.95

296.35

16.40

12.56

5.6


Central

BU-29-17

UI

Endo

212.10

224.55

12.45

12.03

3.8



including

UI

Endo

212.10

216.50

4.40

4.25

4.5



including

UI

Endo

220.05

224.55

4.50

4.35

4.6


Central

BU-30-17

UI

Exo

18.15

19.20

1.05

0.95

13.1


Central

BU-31-17

LC

Exo

440.75

444.85

4.10

3.85

3.8



and

LI

Exo

455.95

519.80

63.85

26.98

18.4

15.5


including

LI

Exo

455.95

466.90

10.95

4.63

6.3



including

LI

Exo

468.35

506.75

38.40

13.13

26.9

22.1


including

LI

Exo

506.75

519.80

13.05

4.46

5.7


East

BU-33-17

UI

Exo

369.75

374.45

4.70

3.85

4.7



and

UI

Endo

379.20

382.15

2.95

2.42

3.9



and

UI

Endo

402.35

407.45

5.10

3.91

3.4



and

UI

Endo

415.20

416.60

1.40

1.21

28.7



and

UI

Endo

431.45

433.55

2.10

1.82

7.8


Central

BU-34B-17

Sill

Endo

389.10

390.05

0.95

0.89

10.5



and

LC

Exo

402.30

406.05

3.75

3.74

3.4


Central

BU-35-17

UI

Exo

337.45

340.05

2.60

2.59

4.1


East

BU-36-17*

UI

Endo

412.80

413.55

0.75

0.70

4.9


Central

BU-37-17

UI

Exo

271.50

273.00

1.50

1.49

8.4



and

Sill

Endo

383.35

389.25

5.90

5.70

4.1



and

LC

Exo

411.95

420.85

8.90

8.60

16.8



including

LC

Exo

418.20

420.85

2.65

2.56

31.2


East

BU-38-17

UC

Endo

354.25

356.95

2.70

2.61

5.0



and

UC

Endo

391.50

395.85

4.35

4.20

5.5


East

BU-40-17*

UI

Exo

314.35

318.25

3.90

2.99

2.5


Central

BU-41-17

LI

Exo

451.65

490.50

38.85

13.29

17.6

17.4


including

LI

Exo

453.60

461.65

8.05

2.75

22.7



including

LI

Exo

480.70

487.45

6.75

2.31

31.7

30.7


and

LI

Exo

497.60

515.20

17.60

4.56

14.1



and

LI

Exo

519.55

538.60

19.05

4.93

17.0

16.0


including

LI

Exo

520.75

529.60

8.85

1.54

31.3

29.0


and

LI

Exo

560.55

586.30

25.75

4.47

4.9



and

LI

Exo

617.25

626.30

9.05

2.34

7.6


NOTES: Intervals in bold are shown on cross sections or mentioned in the text of the news release

*Drill holes BU-36-17 and BU-40-17 dilute below 3 gpt; all other intercepts are over 3 gpt when diluted to a minimum true width of 3 metres are shown

UC = Upper Contact of Sill; LC = Lower Contact of Sill; Sill = Oxide within Sill; UI = Intrusive Contact above Junction with Sill; LI = Intrusive Contact below Junction with Sill

Individual assays within the intercepts were capped using 40 gpt limit

 

Figure 1: Plan View Map of Bermejal Area Showing Geology, Drill Holes Reported and Outline of Bermejal Underground Resource at 1,175 m elevation

Figure 1: Plan View Map of Bermejal Area Showing Geology, Drill Holes Reported and Outline of Bermejal Underground Resource at 1,175 m elevation (CNW Group/Leagold Mining Corporation)

Figure 2: Cross Section A-A' Facing East Showing Step-Out Drilling below the Sill in the Bermejal Underground Deposit

Figure 2: Cross Section A-A’ Facing East Showing Step-Out Drilling below the Sill in the Bermejal Underground Deposit (CNW Group/Leagold Mining Corporation)

Qualified Persons

Doug Reddy, P.Geo, Leagold's Senior Vice President – Technical Services, is a Qualified Person under NI 43-101, and has reviewed and approved the technical contents of this news release on behalf of Leagold.

Los Filos Mine employs industry standard drilling and sampling procedures.  All exploration samples are sent to an ALS Global facility in Guadalajara for preparation and Vancouver for analyses by fire assay and ICP.  A full quality control and assurance program and protocols are in place and are aligned with best practices including regular insertion of certified reference standards, blanks, and duplicates.

About Leagold Mining Corporation

Leagold is building a new mid-tier gold producer with a focus on opportunities in Latin America.  Leagold is based in Vancouver, Canada and is listed on the TSX under the trading symbol "LMC".  The recent acquisition of the Los Filos Mine, a low-cost gold producer in Mexico, provides an excellent platform for growth.

On behalf of Leagold Mining Corporation

Neil Woodyer, Chief Executive Officer

This news release contains "forward-looking statements" and "forward looking information" (as defined under applicable securities laws), including but not limited to plans for future development of the Los Filos Mine. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "expects", "expected", "budgeted", "forecasts" and "anticipates". Forward-looking statements and information, while based on management's best estimates and assumptions, are subject to risks and uncertainties that may cause actual results to be materially different from those expressed or implied by such forward-looking statements, including but not limited to: risks related to the Los Filos Mine, risks related to the successful integration of the acquisition; risks related to international operations; risks related to general economic conditions and credit availability, actual results of current exploration activities, unanticipated reclamation expenses; changes in project parameters as plans continue to be refined; fluctuations in prices of metals including gold; fluctuations in foreign currency exchange rates, increases in market prices of mining consumables, possible variations in ore reserves, grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes, title disputes, claims and limitations on insurance coverage and other risks of the mining industry; delays in the completion of development or construction activities, changes in national and local government regulation of mining operations, tax rules and regulations, and political and economic developments in countries in which Leagold operates. Although Leagold has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The forward-looking statements and forward-looking information are made as of the date hereof and Leagold disclaims any obligation to update any such factors or to publicly announce the result of any revisions to any of the forward-looking statements or forward-looking information contained herein to reflect future results. Accordingly, readers should not place undue reliance on forward-looking statements and information.  Please refer to Leagold's most recent filings under its profile at www.sedar.com for further information respecting the risks affecting Leagold and its business.

Leagold Mining Corporation (CNW Group/Leagold Mining Corporation)

SOURCE Leagold Mining Corporation

View original content with multimedia: http://www.newswire.ca/en/releases/archive/August2017/31/c3234.html

Copyright CNW Group 2017